Blenjar
04-29-2007, 03:57 PM
Well half of hte mission is completed thx to Mr. Violin, sam07yaris, Yaris guy from socal who's gonna sell me his projector (I'll have half of 2 sets)
THe harness is completed
Now the housing will be delt with sometimes next week, by Friday, already bought the high temp paint...im ready to rumble..
ps. this costed me a lot of money...nearly 900 dollar...
:(
talk about lucky but I solve lots of problem for HID Bi-Xenon wanting folks..
I'll post a diagram on how I exactly got mine set up, nice and dumb proof.
WIll also post a video later 2nite...im outside on my laptop right now...yay im go eat, later..
\
**I was gonna gave up but I said "fuk, half of my day is gone, i rather complete something than do half of my harness and half of my skool studying...10 mins later it worked.
Lesson here is never to give up..lol
-- Blen
THe harness is completed
Now the housing will be delt with sometimes next week, by Friday, already bought the high temp paint...im ready to rumble..
ps. this costed me a lot of money...nearly 900 dollar...
:(
talk about lucky but I solve lots of problem for HID Bi-Xenon wanting folks..
I'll post a diagram on how I exactly got mine set up, nice and dumb proof.
WIll also post a video later 2nite...im outside on my laptop right now...yay im go eat, later..
\
**I was gonna gave up but I said "fuk, half of my day is gone, i rather complete something than do half of my harness and half of my skool studying...10 mins later it worked.
Lesson here is never to give up..lol
-- Blen