Quote:
Originally Posted by paulge3
Factory paint is baked at a higher temperature for a longer period of time while local body shops do it at a lower temperature for a shorter time, so repainting your hood needs some time to fully cured. The recommend waiting time is 30 days.
|
Yep that's my dilemma... I've been looking at replacement hood and front bumper from a place called Martins on ebay (new non factory replacment panels) and also through car-parts.com (salvage yard replacement parts)... I'll be having whichever I get repainted, then allow it to cure, then installing xpel after like 2 months in storage at my house... I'll fit the parts to make sure they match up correctly first as well;)